Description
The surface on which the paint is applied must be solid, clean, dry and impregnated with BK-Substrate. The preparation of the paint is done by adding about 5-10% of water, with good mixing until complete homogenization. Application is usually done with a short-haired roller and, if necessary, by brush or spray, usually in two layers. The application of the second layer is done after complete drying of the first layer, which under normal conditions (T = + 23-25 ºC, relative humidity = 50-60%) requires 4-6 h. Subsequent color corrections during installation (additional dilution, addition of pigment, etc.) are not allowed. See product data sheet for more detailed instructions.
About 65-75 ml / m2 for two-layer coating.
18 months in the original packaging. Store at temperatures from + 5 ° C to + 25 ° C, protected from sunlight and frost.
1l; 2.5l; 5l; 10l.